Jul 20, 2020
Sanding
- (8 hours)
Category: Fuselage
Cleaned layups from Saturday. Tapped sump tank fuel line connectors and re-installed. Now the gear can move fully without interference. Replaced paper and tape covering over bottom windows. Cleaned windows and recovered. Cut out and replaced PVC pipe used to cover drain valve because the angle changed when bolting in the sump tank after sanding more of the area around the tank to provide more clearance for the gear.